Friday, 8 July 2011

Everyones dead

Everyone's dead except the crew of the SL and the ducks. Or thats how it felt as we wound round the base of Netherton church with not a living thing noticeable off the canal. Passed two hotel boats working through Parkhead lockwith 8 guests on board. Squally showers and Chris drove the boat.


Eventually came to the post industrial landscape of Cobbs Engine house and commenced on Netherton tunnel-about two miles long. Chris drove.

Netherton Tunnel


Onto deep, wide, water of Telford's New Main line and opened SL up and covered the 10 miles from the tunnel to Birmingham in 2 hours dead arriving next to National Indoor Arena B'ham 1530.

No comments:

Post a Comment